300T/H MOBILE IRON ORE CRUSHING AND SCREENING PRODUCTION LINE IN SINKIANG
SANME engineers analyze the possible influence on air, water, sound, solid waste, ecological and other environmental problems in detail, and put forward corresponding protection measures. Finally, we settle down a comprehensive feasible plan.It has proved that evaluating the potential environmental influence before exploiting iron mine is an effective way to reduce mining cost.
PRODUCTION TIME
2013
LOCATION
Sinkiang
MATERIAL
Iron ore
CAPACITY
300t/h
EQUIPMENTS
ZSW600x1200 vibrating feeder, PE900x1200 jaw crusher, two sets of SMH250C cone crushers, two sets of SMH250F cone crushers
PROJECT OVERVIEW
EQUIPMENT CONFIGURATION TABLE
Model | Product Name | Number |
ZSW600x1200 | vibrating feeder | 1 |
PE900x1200 | jaw crusher | 1 |
SMH250C | cone crushers | 2 |
SMH250CF | cone crushers | 2 |